Setup guides, free DataBridge templates for Primavera P6 and Microsoft Project, and sample data: everything you need to get started with the BFVZ Power BI visuals.

Setup Guides

Step-by-step documentation for configuring BFVZ visuals with your project data.

POWERHealth User Guide

The complete guide to BFVZ POWERHealth 6.0: data roles and table layouts, the frame and its overlays, the Health, Risks and Resources views, the 14 DCMA metrics, KPIs, risk codes, leveling strategies and the format pane, with screenshots throughout.

.pdf POWERHealth 6.0.10 User Guide 20 pages
Download

POWERHealth Quick Setup Guide

Set up BFVZ POWERHealth 6.0 step by step: import a two-table dataset, create the Task ID relationship, map the data roles, set the status date, verify the dashboard and try the key features, with screenshots. The Sample Schedule Dataset below has the same two-table layout.

.pdf POWERHealth 6.0.10 Quick Setup 12 pages
Download

POWERHealth Resource Setup Guide

Covers single-table and two-table data models, P6 and MSP export steps, Power BI relationship configuration, and the field mapping reference for BFVZ POWERHealth resource analysis.

.pdf POWERHealth Resource Setup
Download

PowerGantt Quick Start Guide

Get BFVZPowerGantt rendering your schedule in under 10 minutes. Covers installation from AppSource, required data field mapping, baseline configuration, and critical path display.

.pdf PowerGantt Quick Start
Download

DataBridge for Primavera P6: Setup Guide

Load a P6 schedule into BFVZPowerGantt in three steps: export the XER from P6 Professional or EPPM, open the DataBridge template and point it at the file, then map the P6_TASKS fields into PowerGantt. Includes the field reference, refresh steps and the .pq paste-in instructions.

.pdf DataBridge Primavera P6 3 pages
Download

DataBridge for Microsoft Project: Setup Guide

Load a Microsoft Project plan into BFVZPowerGantt in three steps: save the plan as XML, open the DataBridge template and point it at the file, then map the MSP_TASKS fields into PowerGantt. Includes the field reference, refresh steps and the .pq paste-in instructions.

.pdf DataBridge Microsoft Project 2 pages
Download

PowerGantt Lite Quick Start Guide

Get BFVZ PowerGantt Lite drawing your schedule in under 10 minutes: the data you need, adding the visual, the data roles, navigation, the nine format cards and how to read the chart.

.pdf PowerGantt Lite Quick Start 3 pages
Download

BFVZ DataBridge

Free Power BI templates that bring Primavera P6 and Microsoft Project schedules into BFVZ PowerGantt and BFVZ PowerGantt Lite. No add-ins, no services, no data leaves your machine.

Export from your scheduling tool, open the template, point it at the file, load. DataBridge rebuilds the WBS hierarchy, keeps every relationship (FS, SS, FF and SF, with lag), carries baselines and progress, and flattens resource assignments, all in the exact field layout PowerGantt expects.

DataBridge for Primavera P6

Reads the XER file exported from P6 Professional or EPPM (File > Export > Primavera PM (XER)) and loads a P6_TASKS table ready for PowerGantt: activity IDs and relationships, WBS path and phases, actual, current and planned dates, percent complete by type (Duration, Units, Physical), float and critical flag, constraints, start and finish milestones, resources with budgeted and actual units, multi-project exports.

.pbit PowerGantt Primavera P6 31 KB
Download

DataBridge for Microsoft Project

Reads the XML file saved from Microsoft Project 2007 or later (File > Save As > XML Format) and loads an MSP_TASKS table ready for PowerGantt: unique IDs and predecessor links with lag, the outline hierarchy rebuilt as WBS path and phases, actual dates, the saved baseline, percent complete, total slack and critical flag, constraints and deadlines, resource assignments with work hours and max units.

.pbit PowerGantt Microsoft Project 34 KB
Download

DataBridge Sample Files

Try either bridge before exporting your own schedule. Three fictional data center construction projects as both P6 XER and Project XML, with phases, lagged relationships, baselines, progress and resource assignments.

.zip XER + XML 3 projects 35 KB
Download

Power Query Source

The .pq text of both bridges, the same code the templates run, for adding DataBridge to an existing report: create the parameters named at the top of the file, then paste the query into a blank query in Power Query.

.zip .pq P6 + Microsoft Project 10 KB
Download

Requirements: Power BI Desktop (current release) and BFVZ PowerGantt 6.2 or later, or BFVZ PowerGantt Lite 1.0. The P6 bridge reads XER files from P6 Professional and EPPM, any version. The Project bridge reads XML saved by Microsoft Project 2007 through the current release. DataBridge is Power Query code and runs entirely inside Power BI; it makes no network calls and sends nothing to BFVZ. The templates are provided free and may be modified for your own use. Questions: support@bfvztech.com.

Why XER and XML instead of Excel exports?

Excel exports from P6 and Project depend on the columns and field map you choose, so no two look alike. XER and XML are the tools’ own interchange formats: every field, every relationship, every assignment, always in the same place. One template works for everyone.

Do I need to set up relationships in Power BI?

No. Each bridge produces one flat table that PowerGantt reads directly.

Will my baseline come through?

Project: yes, the saved baseline. P6: XER exports carry planned dates, which the bridge uses as the baseline. If your P6 practice is to maintain a separate baseline project, export it and compare in PowerGantt using the baseline fields.

Can I add the bridge to an existing report?

Yes. The Power Query source of each bridge is available above as a separate download. Create the parameters named at the top of the file, then paste the query into a blank query in Power Query.

Sample Data

Pre-built datasets for evaluating the BFVZ visuals or training your team. The data is fictitious, with the logic, lags, baselines and resource assignments the visuals expect.

Sample Schedule Dataset

Multi-project schedule dataset with typed relationships, resource assignments, baseline dates and float values. Ready for both BFVZPowerGantt and BFVZ POWERHealth.

.xlsx Multi-project Tasks + Assignments
Download

PowerGantt Lite Sample Schedule

A 100-task ERP implementation in eight phases and eight workstreams, with typed relationships and lags, baselines, progress, milestones, owners and budgets. One row per task in the layout BFVZ PowerGantt Lite reads, plus a field-mapping sheet, notes and a dependency legend.

.xlsx PowerGantt Lite 100 tasks 20 KB
Download

Microsoft Project Online retired on September 30, 2026

If your reporting was built on Project Online, bring the Microsoft Project schedule data into Power BI with BFVZPowerGantt and BFVZ POWERHealth: the same data, with the critical path and the schedule health computed in the report. The free DataBridge for Microsoft Project template above loads the XML you save from Microsoft Project in the layout PowerGantt expects, with no manual data preparation.

Get PowerGantt on AppSource

Need Help?

If you have questions about data setup or any BFVZ product, reach out at support@bfvztech.com or visit our Support page.